EXWP 2 includes the following:
1. MIL spec loom ( not included ) installed and clipped/ routed to the receiver location.
2. 13 Servos ( not included ) installed and centered at 150 ms.
3. Battery looms installed on MPX connectors, routed to the switch location.
4. Flight controls tested and QC passed.
This equates to 32 hours of work and is made in-house by our aero certified assembly technicians.