EXWP 3 includes the following:
1. Landing gear ( not included ) installed
2. Gear doors hinged
3. Gear door pushrods installed and connected
4. Door servos ( not included ) installed and connected to pushrods
5. Door and gear cinematics tested and tuned
6. Brakes tested on the bench
This equates to 32 hours of work and is made in-house by our aero certified assembly technicians.